In the pits before the Endurance Race. ( Tightening the lugs, because seconds before another teams car on the track lost a wheel!)
Thursday, May 28, 2009
Michigan FSAE Photos (Part I)
Monday, May 4, 2009
Friday, April 17, 2009
assembly v1.0
Come see the car this Sunday at Presidents Tea, 4/19/2009 , 2-4 PM on Humphreys Lawn at Stevens Institute of Technology.
More Pictures:
http://www.stevens.edu/fsae/av1/
More Pictures:
http://www.stevens.edu/fsae/av1/
Tuesday, April 14, 2009
Presidents Tea Prep
Monday, April 13, 2009
Friday, April 3, 2009
Cost Report Submitted!
280 pages, $9,865.
The paper work is complete and focus is 100% on the car. We have crashed the schedule to get it ready for Presidents Tea on April 19th. The exterior should be complete as well as the suspension so we should have a nice rolling chassis. The engine is being wired to our megasquirtV2.0 .
Thursday, March 12, 2009
Spring Break Update
Friday, February 27, 2009
Wednesday, February 25, 2009
Monday, February 23, 2009
Friday, February 13, 2009
Thursday, February 12, 2009
Monday, February 9, 2009
Schedule update
After a very productive meeting; our revised schedule is published : calendar
Camera is working, PICS soon
Camera is working, PICS soon
Friday, February 6, 2009
Update
Stute article published today; great press. Excellent and well written article, many thanks to Melissa Weigand for her talented editorial and the help with the front suspension.
-Front suspension tacked and ready to be finalized
-Engine mounted in old chassis, awaiting a battery tender, fuel pressure regulator, and fuel.
-confident this engine will purrr in the next few days
-Order received today; allows the beginning of the Impact Attenuator fabrication and a few other projects.
-Fiberglass still in the works
-Front suspension tacked and ready to be finalized
-Engine mounted in old chassis, awaiting a battery tender, fuel pressure regulator, and fuel.
-confident this engine will purrr in the next few days
-Order received today; allows the beginning of the Impact Attenuator fabrication and a few other projects.
-Fiberglass still in the works
Monday, February 2, 2009
Groundhog Day
The rack & pinion was relocated and tacked; this was done to allow for proper leg clearance and Figure 9 of the rule book.
The suspension is being positioned, one tab at a time...
The suspension is being positioned, one tab at a time...
Formula Student Info
Youtube video describing the competition
http://www.youtube.com/watch?v=SH3H5bsvI0g
http://www.youtube.com/watch?v=SH3H5bsvI0g
Friday, January 30, 2009
Meeting Location
SHOP TIMES: The shop is open for members to work on the car every weekday and on Saturdays during the times listed below. If you are interested in working on the car please stop by the shop at any of these times.
Monday: 5pm to 8pm
Tuesday: 2pm to 5pm
Wednesday: 5pm to 8pm
Thursday: 2pm to 5 pm
Friday: 11am to whenever you need to leave
Thursday, January 29, 2009
ENGINE!
The mess that some called a wiring harness was figured out today, hooked up to a battery and...
the Engine turned over!
this week we want to secure it, put some fuel and radiator on it and see if it runs
The mounting points for the 5point harness are ITW; some clarification on the rules are needed.
the Engine turned over!
this week we want to secure it, put some fuel and radiator on it and see if it runs
The mounting points for the 5point harness are ITW; some clarification on the rules are needed.
Wednesday, January 28, 2009
Too busy in the shop to remember to update
We have made some great progress in the 3weeks since last post.
Camera broke :( hope for some new pics up soon.
Exhaust is well on its way thanks to the very generous work and donations by Richie from
http://www.europeanexchange.com/
It is greatly appreciated
Fiberglass has seen the mold created and shaped.
The first attempt at learning to fiberglass is underway; some great results are developing
The braking problem previously mentioned has been solved and is awaiting the purchase of a new pedal assembly. We should not be receiving the 35 point penalty.
The engine was finished being rebuilt, with intake attached. Are attempting to figure out the wiring harness and ECU; but will probably need to wait till the new one arrives.
-Second engine ordered and on the way
I was interviewed today by Melissa from the Stute and there should be an article in the next weeks student newspaper. This should increase awareness and participation in the project. There are many systems underway and we are well prepared for the new members.
Camera broke :( hope for some new pics up soon.
Exhaust is well on its way thanks to the very generous work and donations by Richie from
http://www.europeanexchange.com/
It is greatly appreciated
Fiberglass has seen the mold created and shaped.
The first attempt at learning to fiberglass is underway; some great results are developing
The braking problem previously mentioned has been solved and is awaiting the purchase of a new pedal assembly. We should not be receiving the 35 point penalty.
The engine was finished being rebuilt, with intake attached. Are attempting to figure out the wiring harness and ECU; but will probably need to wait till the new one arrives.
-Second engine ordered and on the way
I was interviewed today by Melissa from the Stute and there should be an article in the next weeks student newspaper. This should increase awareness and participation in the project. There are many systems underway and we are well prepared for the new members.
Tuesday, January 6, 2009
Chassis complete