Sunday, December 28, 2008

Welder

The chassis has been taken to the welder, it should be ready for tabs and the first fitting of parts by 1/4/09.
In the mean time, we shall be working on the exterior fiberglass.

Tuesday, December 23, 2008

Chassis Milestone

The corrected chassis is ready for the welder this week.




Wednesday, December 3, 2008

Progress update

The frame is nearly ready for the welder!
We have cut off all the bad members + tabs & polished it up. We have the new members cut and sent to the machine shop for exact angle cuts. The back frame box is tacked together and ready to accept the final supports when ready. We hope to have the frame welded and finished by Dec15th or so.

The engine has been cleaned, with new seals and completely rebuilt.

There was a problem with the braking system design; the force required to lock the wheels [80lbs] would not be acceptable, as well as the placement of the braking master cylinder would not comply with section 7.3 of the rules, requiring a template of a certain size to pass through the passenger compartment. We plan to re-work the braking design and probably need new master cylinders.

Monday, December 1, 2008

Design Work

A milestone created at the beginning of this project was to have the design completed for December 1st. We have nearly succeeded. The majority of the systems are finalized and parts being ordered this week. The next few weeks we will be finishing up fabrication and begin assembly shortly after XMas.